Subject: Donner Fire Suppression System Update
Date: Fri 2/28/2003 2:42 PM
From: Housing <univhous@andrew.cmu.edu>
To: Donner-Residents@wgs.housing.cmu.edu <Donner-Residents@wgs.housing.cmu.edu>
Donner Residents,
The progress has been steady on the installation of the fire suppression
system. Rycon is finishing up the drywall on the 1st floor hallway ceilings
today. Ryco has finished and tested the majority of the 1st floor piping.
They have the "A" level west piping installed. The 2nd floor rooms have
been taped and at least the first coat of joint compound has been applied.
In the upcoming week, the 1st floor hallway ceilings will be taped and
joint compound will be applied. The 2nd floor rooms will receive another
coat of joint compound.
"A" level resident room pipe installation should be completed by the end
of the week. "A" level hallway ceiling framework will be installed as well.
If you have any questions or concerns, please feel free to e mail me.
A personal e mail will follow giving specific project information to each
resident for their floor.
Sincerely,
Thom Thornton
Housing Services Facility Coordinator
----------------------------------------------------------------